|
-
Albertson O.E. (1992) Clarifier design. In Design and
retrofit of wastewater treatment plants for biological nutrient removal.
Randall C.W., Barnard J.L. and Stensel H.D., editors. Technomic Pub. Co.
Lancaster, USA.
-
Albertson O.E., R.F. Scott, H.D. Stensel and R.W. Okey
(1991) Expansion and Ugrading of Columbus, OH WWTPs to Advanced Wastewater
Treatment. Wat. Sci. Tech. 25, 1-8.
-
Andrews J. F. (1992) Dynamics and Control of the
Activated Sludge Process, Water Quality Management Library - Volume 6,
edited by J. F. Andrews, Technomic Publishing Company, Inc., Lancaster, PA,
USA.
-
ATV (1991) Bemessung von einstufigen Belebungsanlagen ab
5000 Einwohnerwerten. Arbeitsblatt A 131, ATV, St. Augustin, BRD.
-
ATV-DVWK (2000) „Bemessung von einstufigen
Belebungsanlagen“Arbeitsblatt A 131, Regelwerk ATV-DVWK, GFA, Hennef,
2000.
-
Daigger G.T. (1995) Development of refined clarifier
operating diagrams using an updated settling characteristics database. Water
Environment Research, 67, 1, 95-100.
-
Dick R. I. and Vesilind P. A.(1969)
The Sludge Volume Index—What is it? Journal Water Pollution Control
Federation, Vol. 41, No. 7, pp. 1285-1291.
-
Dupont R. and M. Henze (1992) Modelling of the secondary
clarifier combined with the activated sludge model No. 1, Water Science
& Technology, vol. 25, no. 6, pp. 285-300.
-
Ekama G.A. and Marais G.vR. (1986)
Sludge settleability and secondary settling tank design procedures. Water
Pollution Control, 85(1), 101-113.
-
Ekama G.A., J.L. Barnard, F.W. Günthert, P. Krebs, J.A.
McCorquodale, D.S. Parker and E J Wahlberg (1997) Secondary Settling
Tanks: Theory, Modelling, Design and Operation. IAWQ Scientific and
Technical Reports, IAWQ London, U.K.
-
Eckenfelder W. W. and P. Grau (1992) The Activated
Sludge Process Design and Control: Theory and Practice, Technomic Publishing Company, Inc., Lancaster, PA, USA.
-
Eckenfelder W. W. and P. Grau (1998) The Activated
Sludge Process Design and Control: Theory and Practice (2nd edition), Technomic Publishing Company, Inc., Lancaster, PA, USA.
-
Günthert F.W. (1984) Ein Beitrag zur Bemessung von
Schlammräumung und Eindickzone in horizontal durchströmten runden
Nachklärbecken von Belebungsalnlagen. Ber. aus Wassergütewirtschaft und
Gesundheitsingenieurwesen, TU München.
-
Henze M., P. Harremoes, J. la Cour Jansen and E. Arvin
(1995) Wastewater Treatment: Biological and Chemical Processes, Springer
Verlag, Heidelberg, Berlin, Germany.
-
Henze M., R. Dupont, P. Grau and A. de la Sota (1993)
Rising sludge in secondary settlers due to denitrification, Water
Research, vol. 27, no. 2, pp. 231-236.
-
Krebs P. (1991) The hydraulics of final settling tanks, Water
Science & Technology, vol. 23, no. 4-6, pp. 1037-1046.
-
Krebs P. (1995) Success and shortcomings of clarifier
modelling, Water Science & Technology, vol. 31, no. 2, pp.
181-191.
-
Orhon D. and N. Artan (1994) Modelling of Activated
Sludge Systems, Technomic Publishing Company, Inc., Lancaster, PA, USA.
-
van Haandel A. and van der Lubbe J. (2007) Handbook
Biological Waste Water Treatment. Quist Publishing - Leidschendam - The
Netherlands.
-
Yoshioka, N., Y. Hotta, S. Tanaka, S. Naito, a S. Tsugani (1957)
Continuous Thickening of Homogeneous Flocculated Slurries. Chemical
Engineering, Tokyo, 21,66-74.
-
Water Environment Federation (2005) Clarifier design. WEF manual of
practice No FD-8 (2nd Ed.).
-
Zhou S., C. Vitasovic, Z. Ji, R. Pfeil (1996) Impact of
design features on clarifier performance. Proc. of 18th IAWQ Biennial
Conference, Preprints, Book 3, 278-285, 23-28 June, Singapore.
|